When Markesan District Schools needed fast, reliable concrete and site repairs, C.D. Smith’s ProjectPlus team responded with the same care and coordination given to large builds. The result is safer spaces for students and a relationship built on trust and adaptability.
When Markesan District Schools faced challenges finding a contractor for minor but essential repairs, they needed a construction partner who could deliver, no matter the size of the job. With student safety and minimal disruption as top priorities, C.D. Smith answered the call.
The first small but critical project involved removing failing pavement and pouring new concrete at Markesan High School. The C.D. Smith ProjectPlus team mobilized quickly to replace cracked, unsafe slab sections with fresh concrete before the start of the 2022 to 2023 school year.
Explore our self-perform concrete capabilities.
Our relationship did not end there. Recognizing ongoing needs, Markesan invited our team back in 2023 to complete additional projects while school was out.
Through our ProjectPlus commitment, we provided the service and adaptability that every project deserves.
That is the C.D. Smith difference. Treating every project like it is the most important one, because to our clients, it is.
“C.D. Smith was responsive, addressed our needs immediately, and treated each project like a priority. Their follow-through made the difference.”
Jason Breaker, District Administrator / Principal, Markesan District Schools
See how this approach supports education clients and how relationships and adaptability drive project success.
###
Date: Spring/Summer 2025 | Author: Molly Haack
«•»