Your Industry

Forensic Science & Protective Medicine Facility

Written by Debbie Hoff | Sep 29, 2026, 7:48:56 PM

C.D. Smith served as Construction Manager for the Forensic Science and Protective Medicine Facility, a $204 million, 217,150-square-foot facility located on the Milwaukee Regional Medical Center campus in Wauwatosa. Delivered using the CM At Risk method and designed by Desman Inc., the facility brings together the Wisconsin State Crime Lab, Milwaukee County Medical Examiner's Office, Office of Emergency Management and Versiti in a single, highly specialized environment designed to support forensic science, emergency response and medical investigation.

Among the facility's most specialized elements are advanced crime labs, autopsy suites, evidence storage, a firing range, emergency management operations and complex mechanical systems engineered to maintain strict environmental separation between sensitive spaces. By co-locating critical agencies under one roof, the facility improves collaboration, streamlines operations and strengthens the region's ability to respond to public safety and forensic challenges.

 
 

Construction Leadership and self-perfom expertise

Completed in April 2026, the project required extensive coordination on an active healthcare campus. C.D. Smith self-performed sitework, concrete, masonry, steel erection, parking garage precast installation, GFRC façade installation, rough carpentry and millwork, maintaining quality, safety and schedule control throughout construction. The project was delivered on time and on budget while creating a purpose-built environment that will support Southeast Wisconsin for decades to come.

 

Project Features

  • Advanced crime labs
  • Autopsy suites
  • Evidence storage
  • Firing range
  • Emergency management operations

Related Links

Building Smarter at UW-Stevens Point | Beneath the Hard Hat® Magazine | Fall 2025

Sustainability | Building Better by Design

Self-Perform Capabilities | We Self-Perform. You Benefit.

Education Projects in the News

Beneath the Hard Hat® Magazine

###

Date: Spring 2026 | Author: Tracy Lisowe

«•» 

Follow C.D. Smith ON SOCIAL

#CDSmith #ThinkSafeWorkSafe

 

UW-Stevens Point Project News

Building Smarter at UW-Stevens Point | Sustainability & Self-Perform Construction | Beneath the Hard Hat® Magazine | Fall 2025

The Gale and Paul Kirby Library and Student Resource Center at UW-Stevens Point replaces the former Albertson Hall with a four-story, 150,000 SF facility that consolidates library resources, academic archives and student support services under one roof. The project achieved a 92% material diversion rate against a 75% target through deliberate demolition planning and on-site material reuse, while incorporating green roofs, 350 roof-mounted solar panels and other sustainability-focused design strategies throughout. Learn how sustainability goals, self-perform construction and strategic planning contributed to the project's success. Read more about the Gale and Paul Kirby Library and Student Resource Center at UW-Stevens Point.

UW-Stevens Point's Newest Building Named for Alumni Couple | University of Wisconsin-Stevens Point | 05.11.2026

UWSP Names New Library, Student Center for Plover Couple | SP Metro Wire | 05.12.2026

New UW-Stevens Point Library Honors Plover Couple for Alumni Support | Stevens Point Journal | 05.12.2026

Gale and Paul Kirby Library and Student Resource Center Opens at UW-Stevens Point | Thornton Tomasetti on Facebook| 05.08.2026

Final Pieces of Albertson Hall at UWSP Coming Down | WSAW | 10.10.2023

UWSP Ready to Part Ways with Old Albertson Hall to Build a New Library | WSAW | 10.10.2023

UW-Stevens Point Ready to Say Goodbye to Beloved Campus Library | WAOW | 07.27.2023

Exterior Demolition of Former Library to Begin at UW-Stevens Point | Wausau Pilot & Review | 06.20.2023

UW-Stevens Point Library Closes Ahead of $96 Million Replacement Project | Stevens Point Journal | 05.20.2022