The Sheboygan Water Utility embarked on an extensive initiative to rejuvenate its raw water infrastructure, marking a significant milestone in the utility's history since 1959. C.D. Smith Construction was chosen as the primary contractor for this ambitious, multi-phase project.
The existing 30-inch intake and shore well had surpassed their typical 100-year service life, prompting the need for improvements. This project enhanced the intake capacity to meet both maximum and average daily demand while addressing vulnerabilities such as winter icing, runoff, and flood risks in the low-lift pump station. During construction, 220 tons of rebar were incorporated, and 2,479 cubic yards of concrete were poured.
This extensive project ensures a reliable supply of water to approximately 60,500 residents in Sheboygan County.
Beneath the Hard Hat® Press & Blog
Discover more Civic + Government Construction project solutions by going to our dedicated page.
---
About C.D. Smith
C.D. Smith Construction is an industry leader in safely providing the highest quality commercial construction services. Utilizing an integrated approach and self-performing trade services combined with technical expertise, our team serves as a solutions provider throughout all phases of a project, from planning through construction. With veteran leadership and a dedication to our employees and clients, we proudly place our name on projects of all sizes across the United States.
Visit www.cdsmith.com or follow us on Facebook, Twitter, LinkedIn, Instagram and YouTube.