Beneath the Hard Hat
C.D. Smith Company Blog

One project. Two innovative solutions. Historic Building Renovation.

Date: Sep 24, 2021 11:52:35 AM | Author: Molly Haack

In 2020, construction began on a two-part project on Vel R Phillips Avenue in Milwaukee. This first phase was a 30,000 SF restoration of the 145-year-old St. Francis Monastery. The second was a 16,000 SF addition of the adjacent St. Francis of Assisi Parish Center. During this project, when construction was well underway, the Capuchins (a friar belonging to a branch of the Franciscan) had two requests that were not in the project's original scope. "We were committed to delivering the very best customer service and adapted to the client's request," says Clint Bindrich, C.D. Smith Superintendent

C.D. Smith Construction Superintendent Clint Bindrich is pictured with two innovative solutions for addressing the Capuchins' requests.Superintendent Clint Bindrich with two innovative solutions for addressing the Capuchins' requests.

The Capuchins approached Clint and asked if the historic arches could be exposed during the elevator fitting. The original drawings called for plaster walls covering the arches.

Historic arches showcase original stone and brick at St. Francis historic renovation construction project.Historic arches show original stone and brick.

Pivoting from the original plan, Clint collaborated with engineers as he felt there was a solution. His recommendation was to shore up the arches and fit the elevator in, exposing the original stone and brick. By doing so, the arches could be visible in the finished product, and there would be easy access from the basement to the main floor, dining area and living quarters. It was an innovative solution that exceeded the Capuchins' expectations!

The St. Francis of Assisi Parish Center addition was already underway and being framed when the Capuchins had a second ask to match the Friary exteriors to the new addition exterior facades. Getting an exact match would be close to impossible, as the bricks were 145 years old. A national search began. After reviewing seven brick samples without a match, the construction team headed back to the drawing board.

Repurposed brick salvaged from the interior and repurposed as a perfect match to the exterior.Repurposed brick salvaged from the interior and repurposed as a perfect match to the exterior.

Clint noticed the interior walls in the renovation area were a perfect match for the exterior they were seeking! If demoed carefully, the brick could be salvaged and repurposed for the exterior. This was an ingenious idea that contributed to the overall aesthetic of the restoration while addressing the Capuchins' request. 

"This construction team has gone above and beyond on this construction and restoration project. I have found them to be amazing problem solvers and team members."
Br. Mark Joseph Costello, OFM Capuchin, Provincial Minister
Capuchin Franciscan Province of St. Joseph

«•»

Follow C.D. Smith ON SOCIAL

#CDSmith #ThinkSafeWorkSafe

C.D. Smith Construction Management Design-Build General Contractor Preconstruction Commercial Construction Trades on FacebookC.D. Smith Construction Management Design-Build General Contractor Preconstruction Commercial Construction Trades on LinkedInC.D. Smith Construction Management Design-Build General Contractor Preconstruction Commercial Construction Trades on InstagramWebsite - Twitter - Icon-01C.D. Smith YouTube Videos Construction Management Design-Build General Contractor Preconstruction Commercial Skilled Trades

Contact Us Get in Touch


IN THE NEWS

Halyard Park Monastery and new Parish Center near completion | WTMJ-TV Milwaukee 09.23.2021

Provincial Minister brother Mark Joseph Costello being interviewed about St. Francis' Historic Renovation Construction

MILWAUKEE — St. Francis of Assisi Parish and the Capuchin Franciscan of St. Joseph broke ground on a historic Halyard Park Monastery and new parish center in June.

The old parish was built in 1869 in stages and is now being renovated to house Capuchin friars. However, the upgrades aren't losing the rich history within the building.

Provincial Minister brother Mark Joseph Costello said...(Go to the full news article with video news coverage.)

Contact Us Get in Touch


About C.D. Smith

C.D. Smith Construction is an industry leader in safely providing the highest quality commercial construction services. Utilizing an integrated approach and self-performing trade services combined with technical expertise, our team serves as a solutions provider throughout all phases of a project, from planning through construction. With veteran leadership and a dedication to our employees and clients, we proudly place our name on projects of all sizes across the United States.

Visit www.cdsmith.com or follow us on Facebook, Twitter, LinkedIn, Instagram and YouTube.

Contact Us


Beneath the Hard Hat®, our company press and blog, offers an intimate look at the people and stories that make C.D. Smith Construction. With the latest industry news and project updates, we share insights on the superior spaces we are safely delivering year-round. Our team of technical experts provides useful tips and topics to help plan your next commercial project.

Subscribe to Beneath the Hard Hat For news, insights and updates from our blog

---

TRADE PARTNERS & BIDS |If you're interested in working with us or would like to request adding your company to our bidder's database, please complete our Trade Partners & Bids Form: Click Here.


 

Recent Posts


 


Get in Touch

Corporate Headquarters
125 Camelot Drive
Fond du Lac, WI 54935

Milwaukee Office
8325 W. Tower Ave
Milwaukee, WI 53223

Madison Office
316 West Washington Avenue
Suite 900 
Madison, WI 53703

La Crosse Office
333 Front Street North
Suite 701 
La Crosse, WI 54601

Ready to build community and get connected with commercial construction expertise? Use the below form to submit questions or request information. We look forward to learning more and discovering how we can make YOUR PROJECT. OUR PRIORITY.®.