Constructed by C.D. Smith, the Buchel Stone facility in Chilton, Wisconsin consolidates Buechel Stone's manufacturing, office space and packaging operations.
Constructed by C.D. Smith, the Buchel Stone facility in Chilton, Wisconsin consolidates Buechel Stone's manufacturing, office space and packaging operations.

Buechel Stone

The 66,000 square foot stone cutting and splitting facility includes a unique floor system with numerous trench drains, hydraulic pit trenches and machine bases. Process water is reused with the external concrete water tanks.

The facility consolidates Buechel Stone’s manufacturing, office space and packaging operations.