Completed Student Collaboration Hub at Sunnyside Elementary School featuring a large central skylight, tiered learning stair and flexible seating areas used by students for group instruction and project work.
Completed two-level Student Collaboration Hub at Sunnyside Elementary viewed from the upper level showing the central skylight and flexible learning spaces below.
Aerial view of Sunnyside Elementary School during active construction showing crane operations and the addition taking shape alongside the existing building.
View from the rooftop of Sunnyside Elementary showing structural steel framing and temporary shoring installed during the center core demolition and skylight construction phase.
Interior view looking up through the structural steel skylight frame during construction of the Student Collaboration Hub at Sunnyside Elementary School.
Exterior view of the completed Sunnyside Elementary School addition and renovation showing the new secure entrance and updated facade in Sobieski, Wisconsin.

Herr-Baker Field | Home of Dock Spiders

In time for the 2026 season, the Fond du Lac Dock Spiders transformed Herr-Baker Field into one of Wisconsin’s premier baseball facilities.

A new field for the 2026 season

The centerpiece is a new 142,000-square-foot turf playing surface, the largest turf baseball field in the state, spanning the infield, outfield, warning tracks and bullpens to improve playability and player safety. C.D. Smith Construction served as general contractor, overseeing construction and site management for the turf installation, new fencing, upgraded backstops and netting, concrete pavement, a new pavilion and extensive grading and subsurface drainage improvements designed to enhance field performance in all weather conditions.

 

Bringing fans closer to the action

The renovated ballpark also delivers an upgraded game-day experience for fans, with a new covered hospitality area and field-level patio tables along both baselines that bring spectators closer to the action. New premium netting extends 30 feet high in front of fixed seating and patio areas, providing greater safety while remaining thinner and less obstructive for clearer views.

As the Dock Spiders celebrate their 10th season, the modernized Herr-Baker Field is ready to serve players, fans and the greater Fond du Lac community.

Project Features

  • Artifical turf
  • Stormwater underdrainage
  • Backstop netting systems
  • Perimeter Fencing
  • Concrete Pavement

 

 

###

Date: May 2026 | Author: Tracy Lisowe

«•» 

Follow C.D. Smith ON SOCIAL

#CDSmith #ThinkSafeWorkSafe

Facebook LinkedIn Instagram X (Twitter) YouTube

Contact Us Get in Touch

 


«•»

Related PAGES + Posts You May Like

Pulaski Community School District: From Renovation to Reimagination

Building a Brighter Future: Pulaski School District Construction Projects

Pulaski High School Tech Ed Addition | Construction Updates

Pulaski Community School District Breaks Ground on Sunnyside Elementary Project

Education Construction | PROJECTS IN THE NEWS


Education Construction Solutions Your Industry. Our Expertise.

 


 

Get in Touch

Corporate Headquarters
125 Camelot Drive
Fond du Lac, WI 54935

Milwaukee Office
8325 W. Tower Ave
Milwaukee, WI 53223

Madison Office
316 West Washington Avenue
Suite 900 
Madison, WI 53703

La Crosse Office
333 Front Street North
Suite 701 
La Crosse, WI 54601

 

 

Your Project_Our priority_registered trademark_two color alternate

 

Ready to build community and get connected with commercial construction expertise? Use the below form to submit questions or request information. We look forward to learning more and discovering how we can make YOUR PROJECT. OUR PRIORITY.®.