MEET OUR Fond du Lac TEAM


Michael Krolczyk C.D. Smith Construction Manager Preconstruction Design Build General Contractor Senior VP Fond du Lac WI

 

Michael Krolczyk

Senior Vice President

 Website - Phone - Icon - v2.png       Website - email- Icon.png  


Greg-Sabel-Senior-Vice-President

 

Greg Sabel

Executive Vice President

Website - Phone - Icon - v2.png       Website - email- Icon.png  

C.D. Smith Construction Corporate Office

 

C.D. Smith Construction opened the doors to their new 50,000 SF Corporate Office in May of 2019. The new facility represents the company’s skills offered to clients in trades, sustainability and modern construction. From floor to ceiling, C.D. Smith’s self-performed trades are showcased through exposed steel beams, concrete board-form walls, floating repurposed wood staircases and polished concrete flooring. The new office announced its LEED Gold® certification in April of 2020, making it the first building in Wisconsin and one of nine in the country. The C.D. Smith Corporate Office exemplifies next-generation standards for green building with efficient building materials and for its location, energy usage and indoor environmental quality. C.D. Smith’s new open-concept headquarters also features multiple work areas for collaboration, training and event space for 100+ people and two fitness rooms with 24/7 team member access.

Features include: 

  • 294 Solar Panels
  • Electric Vehicle Charging Stations
  • Sit-Stand Work Stations
  • 20 Conference Rooms
  • Virtual Design Construction Room + Resources
  • Floating Staircases with Reclaimed Wood
  • Light-Harvesting Shades
  • Fitness Center, Pilates Room + Locker Room
  • Bike Storage
  • Access to the Fond du Lac Loop Bike/Walking Trail
  • Patio featuring Bench Seating + Grill area
  • Surrounding Praire Growth
  • White Noise Cancelling System